INTRODUCING
Signature Residences
at Nexzone, Panvel.
Luxury 3 & 4 BHK flats starting 1.03 CR all incl*
INTRODUCING
Signature Residences
at Nexzone, Panvel.
Luxury 3 & 4 BHK flats starting 1.03CR all incl*
Presenting larger-than-life luxury residences at Panvel's finest township. Why settle for less?
Enquire NOW
2 BHK
Starting 82.7L
3 BHK DELUXE
926 sqft.
1.56CR all incl*
4 BHK
1500 sq.ft
2.08CR all incl*
Airport Area
The pre-development work for the long awaited Navi Mumbai airport project has already begun with GVK group. Nexzone is just 10 mins from the airport.
Trans Harbor Sea Link
The game changing 22 Km long bridge will be the gateway to Navi Mumbai and connect Sewri with Nhava Sea Port, the Mumbai Pune Expressway and the Mumbai Goa highway. This will make Nexzone less than 45 minutes away from South Mumbai.
BKC II
The proposed industrial hub at Kharagar is slated to be twice the size of BKC with more than 150 acres of mixed land use. This will drive tremendous new employment and propel further development in the area.
Metro Rail
4 new metro lines have been finalised by CIDCO under Navi Mumbai Metro Corridor 1. This line will connect Belapur to Navi Mumbai airport via Taloja & Khandeshwar.
CST - Panvel AC Rail
The elevated rail corridor will cut travel time between Panvel and CST by half. It is set to include a link to the Lokmanya Tilak Terminus and the proposed Navi Mumbai international airport as well.
Vasai-Panvel Rail Extension
This proposed 70km railway line will be the largest rail expansion project in the city and will provide excellent connectivity to Panvel and Vasai. Panvel station is 15 minutes from Nexzone.
Virar-Alibaug Multi modal Corridor
This 126km long project runs very close to Nexzone and comprises of road, metro, bus lanes and greenways for pedestrians and bicycles. It runs all the way from Virar to Alibaug and is set to be a major boost for development.
Navi Mumbai Airport Influence Notified Area (NAINA)
370 sq km area around the new airport has been declared as NAINA, which demarcates hubs for agro-farming, education, trade, information technology, services, medical treatment, etc in the area. This is going to change the face of the entire region around Nexzone.
Airport Area
The pre-development work for the long awaited Navi Mumbai airport project has already begun with GVK group. Nexzone is just 10 mins from the airport.
Trans Harbor Sea Link
The game changing 22 Km long bridge will be the gateway to Navi Mumbai and connect Sewri with Nhava Sea Port, the Mumbai Pune Expressway and the Mumbai Goa highway. This will make Nexzone less than 45 minutes away from South Mumbai.
BKC II
The proposed industrial hub at Kharagar is slated to be twice the size of BKC with more than 150 acres of mixed land use. This will drive tremendous new employment and propel further development in the area.
Metro Rail
4 new metro lines have been finalised by CIDCO under Navi Mumbai Metro Corridor 1. This line will connect Belapur to Navi Mumbai airport via Taloja & Khandeshwar.
CST - Panvel AC Rail
The elevated rail corridor will cut travel time between Panvel and CST by half. It is set to include a link to the Lokmanya Tilak Terminus and the proposed Navi Mumbai international airport as well.
Vasai-Panvel Rail Extension
This proposed 70km railway line will be the largest rail expansion project in the city and will provide excellent connectivity to Panvel and Vasai. Panvel station is 15 minutes from Nexzone.
Virar-Alibaug Multi modal Corridor
This 126km long project runs very close to Nexzone and comprises of road, metro, bus lanes and greenways for pedestrians and bicycles. It runs all the way from Virar to Alibaug and is set to be a major boost for development.
Navi Mumbai Airport Influence Notified Area (NAINA)
370 sq km area around the new airport has been declared as NAINA, which demarcates hubs for agro-farming, education, trade, information technology, services, medical treatment, etc in the area. This is going to change the face of the entire region around Nexzone.
MARATHON
50+ years of experience, 80+ projects delivered – Marathon is a name you can trust
MARATHON
50+ years of experience, 80+ projects delivered – Marathon is a name you can trust.